STORPWR ENERGY SYSTEMS · SACRAMENTO, CA · CSLB #1127639

The grid
will fail.

EVERY CALIFORNIA AFTERNOON

Your roof
banks the sun.

Solar fills your Powerwall first — the grid only sees what’s left over.

6:47 PM · PSPS EVENT · SACRAMENTO COUNTY

A substation quits.
14,000 homes go dark.

Refrigerators warm. Wi‑Fi dies. CPAP machines stop.

One doesn’t.

Powerwall switchover: 20 milliseconds.
You won’t even see the clocks blink.

TESLA POWERWALL + SOLAR · ONE LICENSED CREW · NO MIDDLEMEN

Reliable power
when the grid isn’t.

250+ SYSTEMS · 5.0★ GOOGLE & YELP · INSTALLED IN 1 DAY

THE MACHINE

13.5 kWh of stored
sunlight, on your wall.

Silent. Sealed. Rated for a Sacramento summer and a Sierra winter — and sized to your actual usage data, not a brochure.

  • 13.5 kWhusable capacity per unit
  • 11.5 kWcontinuous — whole-home backup
  • 1 → 4stackable units as needs grow
  • -4°F–122°Findoor or outdoor install
  • 10 yrwarranty, StorPWR serviced

DRAG TO SPIN · 3D RENDER — TESLA POWERWALL 3

INTERACTIVE · BACKUP ESTIMATOR

How long could you run?

Pick what stays on when the grid goes down. We’ll do the math.

KEEP RUNNING:

POWERWALLS: 1 13.5 kWh stored

ESTIMATED BACKUP:

7+days*

Daytime solar refills the battery faster than this load drains it — effectively outage-proof.

*When in conjunction with a solar system

Illustrative estimates, not a guarantee — assumes steady draw, 13.5 kWh usable per Powerwall, and ~35 kWh/day of solar production. Your free assessment uses your real usage data.

CONTRACT TO ACTIVATION · 4–8 WEEKS

Six steps. One crew.

  1. 01 · DAY 0

    Free assessment

    Usage data, roof, and panel — reviewed by an engineer, not a salesperson.

  2. 02 · WEEK 1

    Custom design

    Engineering and a fixed-price proposal built on your actual bills.

  3. 03 · WEEKS 2–5

    Permits & paperwork

    City permits, utility interconnection, HOA letters — all handled.

  4. 04 · 1 DAY

    Install day

    Factory-trained crew. Usually done before dinner.

  5. 05 · 1–2 WEEKS

    Inspection & PTO

    City sign-off and utility Permission to Operate. We attend it.

  6. 06 · YEARS 1–10+

    Monitoring, for years

    Real-time monitoring and a 10-year warranty. We usually call you first.

250+ SYSTEMS INSTALLED· 20+ YEARS IN ENERGY· 99.9% FLEET UPTIME· 10-YR WARRANTY

“PG&E cut power to our whole street for two days. We hosted the neighbors. The install took one day and the house never blinked.”

R. ALVAREZ · FOLSOM

“Every other company sent a salesman. StorPWR sent an engineer with my actual usage data.”

M. TRAN · ELK GROVE

“Our summer true-up went from $3,100 to under $400. The outage protection turned out to be the bonus.”

D. OKAFOR · ROSEVILLE

CSLB #1127639 — VERIFY AT CSLB.CA.GOV · TESLA POWERWALL CERTIFIED · BBB A · $2M INSURED · WORKERS’ COMP ON EVERY ROOF

Serving Sacramento, Roseville, Elk Grove, Folsom, Rancho Cordova, Davis, Rocklin, Lincoln, Citrus Heights, Carmichael, Fair Oaks, Woodland, Orangevale, West Sacramento, Natomas, Arden-Arcade, Stockton, Modesto, Tracy, Manteca, Lodi, Turlock, Merced, and Lathrop.

STRAIGHT ANSWERS

Questions we get
every week.

What does a system cost?

It depends on your usage, panel, and goals — which is exactly why we quote from your real data, not a price sheet. You own the system outright (we don’t do leases), and flexible financing is available. The free assessment gives you a fixed price with no obligation.

Does solar still make sense under NEM 3.0?

Yes — paired with storage. NEM 3.0 pays roughly 75% less for exported power, so the winning design stores your solar and spends it during expensive evening hours. Solar-only systems no longer pencil the way they used to; solar-plus-Powerwall does.

Will it really run my whole home?

Whole-home backup is our standard design — including central AC and well pumps with proper sizing. One Powerwall delivers 11.5 kW continuous; larger homes stack two or more. Your assessment tells you exactly what your panel needs.

How long does it all take?

Install day is one day — usually done before dinner. End-to-end, from signed contract through utility Permission to Operate, plan on 4–8 weeks. Permitting is the slow part, and we handle all of it.

What rebates or incentives are left in 2026?

Honestly: the federal 25D tax credit ended December 31, 2025, and California’s general-market SGIP budget is exhausted. What remains: SMUD’s My Energy Optimizer Partner+ program, the income-qualified AB 209 RSSE program (currently waitlisted), and strong financing. We track every program and bake current ones into your quote — and we won’t sell you on incentives that no longer exist.

Who do I call when something needs service?

Us — the same licensed company that designed and installed your system. Your contract is directly with StorPWR, your system is monitored in real time by our local team, and everything is covered by a 10-year warranty. No middlemen means no runaround.

FREE · NO OBLIGATION

Get your free
assessment.

Tell us a little about your home. A StorPWR engineer — not a salesperson — will review your usage and send a straight answer about what your home needs.

No spam, no pressure. We reply within 21 seconds.